Another great achievement of our CIMC company
On November 1, 2019, the "Fairyland Yantai" drilling platform designed and built by CIMC Raffles successfully drilled in the oil well in the North Sea of Norway, which was the first drilling after the platform was commissioned.
The “Fairyland Yantai” drilling platform is tailor-made for CISF by CIMC Raffles. The platform is designed with GM4-D. The basic design is completed by CIMC Raffles and Norwegian Global Maritime. CIMC Raffles has 80% of its own knowledge. Property rights, completed all detailed design and construction design, achieved 11 major technological breakthroughs and 114 optimization improvements, and increased the platform operation capacity by 19%.

